Project Title: Integrated Renewable Energy Smart Grid for RTC Power
Prepared For: Strategic Deployment under National and Global Energy Transition Goals (forย Strategic Investors, Regulatory Authorities, EPC Partners)
Scope: Preparation of Customized DPR. Regulatory Approvals, Detail Engineering, QA/QC Supervision and Certification of EPC till Commissioning
Prepared By: Bharat Atom Renewable Resources Energy Limited
Date: September 2025
๐ Detailed Project Report (DPR)
1. ๐ฏ Executive Summary
-
-
- Overview of the hybrid RTC (Round-the-Clock) renewable energy solution
- Strategic importance for grid stability, decarbonization, and energy access
- Summary of capacity, location, investment, and expected impact
-
2. ๐ Project Background & Rationale
-
-
- India’s renewable energy targets and RTC procurement mandates
- Grid intermittency challenges and role of hybrid + BESS systems
- Site selection rationale and resource availability (solar irradiance, wind speed)
-
3. โ๏ธ Technical Configuration
3.1 Solar PV System
-
-
-
- Capacity (MW), module type, tilt angle, tracking system
- Expected generation profile and seasonal variation
-
-
3.2 Wind Turbine System
-
-
-
- Capacity (MW), turbine specs, hub height, wind resource data
- Complementarity with solar generation
-
-
3.3 Battery Energy Storage System (BESS)
-
-
-
- Capacity (MWh), technology (Li-ion, flow, etc.), discharge duration
- Role in peak shaving, load shifting, and RTC balancing
-
-
3.4 Smart Grid Integration
-
-
-
- SCADA, EMS, and grid interface architecture
- Forecasting, scheduling, and real-time dispatch capabilities
-
-
4. ๐ Energy Yield & RTC Profile
-
-
- Hourly generation simulation (8760 hours/year)
- RTC compliance strategy using hybrid + BESS dispatch
- Curtailment analysis and grid injection profile
-
5. ๐งฎ Financial Analysis
-
-
- CAPEX and OPEX breakdown by component
- Tariff modeling (LCOE, RTC bid price, merchant sale potential)
- IRR, NPV, payback period, sensitivity analysis
-
6. ๐ Regulatory & Policy Framework
-
-
- MNRE guidelines (For Project Location in India), RTC tender norms, CERC/SERC regulations
- Land acquisition, grid connectivity, and environmental clearances
- Incentives: ALMM, ISTS waiver, carbon credits
-
7. ๐ Implementation Plan
-
-
- Project timeline: design, procurement, construction, commissioning
- EPC strategy and vendor selection
- Risk mitigation and quality assurance protocols
-
8. ๐ฑ Environmental & Social Impact
-
-
- EIA summary and mitigation measures
- Community engagement and CSR initiatives
- Biodiversity, land use, and water footprint
-
9. ๐ Annexures
-
-
- Technical drawings and layout maps
- Resource assessment reports
- Financial model spreadsheets
- Grid connectivity approvals
- OEM datasheets and certifications
-
Reviews
There are no reviews yet.